Section 11.16.050. Reports.  


Latest version.
  • The permittee shall provide the director with a preliminary report within six months after September 1 of each year in which the permit is valid and within six months after completion of the work under the permit. The report shall designate in detail  
    		(1) extent of activities;  
    		(2) scope of work undertaken;  
    		(3) nature and extent of collection;  
    		(4) plans for analysis and study of collection; and  
    		(5) reason for any continued site work.  
    

Authorities

41.21.040;41.35.050;41.35.080

Notes


Authority
AS 41.21.040 AS 41.35.050 AS 41.35.080
History
Eff. 1/13/73, Register 44