Section 11.67.092. Title requirements.  


Latest version.
  • Title to the homesite parcel will be conveyed to the permit holder after all of the following have taken place, in accordance with AS 38.08.060(a):  
    		(1) the permit holder pays the total survey and platting costs due, as determined by the director;  
    		(2) the permit holder presents proof that a habitable, permanent, single-family dwelling has been constructed, evidenced by a certificate of inspection from an appropriate state or local official, or proof that the permit holder has requested an appropriate state or local official to make such an inspection; "habitable, permanent, single-family dwelling" means a structure or mobile home, suitable for year-round occupancy with at least 200 square feet of space built or placed on a permanent masonry or treated wood foundation, with sanitary facilities meeting Department of Environmental Conservation requirements, and meeting local building codes if applicable;  
    		(3) the permit holder presents proof that the parcel has been occupied by the permit holder or members of his household for a cumulative total of 35 months.  
    

Authorities

38.04.900;38.05.020;38.08.060

Notes


Reference

11 AAC 67.090
Authority
AS 38.04.900 AS 38.05.020 AS 38.08.060
________________________
History
Eff. 5/4/78, Register 66; am 5/13/79, Register 70; am 10/14/79, Register 72; am 3/30/83, Register 85; am 8/23/87, Register 103