Section 11.87.040. Completion of geothermal exploration.  


Latest version.
  • The operator shall submit a report to the commissioner within 60 days after completion of geothermal exploration and include the following information:  
    		(1) final hole designation and location;  
    		(2) a drilling log noting any water table, aquifers, and sale and mineral deposits encountered;  
    		(3) methods of cementing and completion, and types of casing and tubing used;  
    		(4) complete details of abandonment procedures;  
    		(5) any information on drilling difficulties or unusual circumstances encountered which may be helpful in assuring future safety of operations or protection of the environment in the area concerned; and  
    		(6) temperature data and logs for each hole surveyed.  
    