(a) Utility permits are required only for section-line rights-of-way presently used or proposed for use by the department. A person seeking to install a utility facility within a section-line right-of-way shall check with the department to determine whether the department presently uses or proposes to use the affected portion of the section-line right-of-way. (b) Before issuing a permit for the installation of a utility facility within a section-line right-of-way, the department must be satisfied that a section-line right-of-way exists at the location where the facility is proposed to be installed by the permit applicant. The permit applicant shall furnish proof of the existence of the section-line right-of-way. (c) An applicant that is granted a permit for the installation of a utility facility within a department section-line right-of-way shall coordinate the installation of the facility with any proposed department project using the section-line right-of-way. (d) The permittee shall provide one copy of each permit for the installation of any utility facility within a department-controlled section-line right-of-way to the Department of Natural Resources. (e) The department will immediately submit written notice to the Department of Natural Resources if a section-line permit application is denied.
Authorities
19.05.020;19.05.040;19.25.010;19.25.200;19.30.051;19.30.121;19.40.065
Notes
Authority
AS 19.05.020 AS 19.05.040 AS 19.25.010 AS 19.25.200 AS 19.30.051 AS 19.30.121 AS 19.40.065History
Eff. 5/23/82, Register 82