Section 17.15.101. Permits for utility service connections.  


Latest version.
  • 	(a)  The department will require an amendment to an existing utility permit or new permit for all utility service connections subsequent to the issuance of the original permit for the distribution, collection, or feeder line facility.  
    	(b)  The department may allow a permittee to install additional service connections within a department right-of-way where a longitudinal underground, surface, or overhead distribution or feeder line has been installed under a utility permit. The department will amend the utility permit to include the additional service connections.  
    	(c)  New permits are required for underground utility service connections which cross a department right-of-way and which originate from distribution lines located outside the right-of-way.  
    