The department will reject as nonresponsive each of multiple bids submitted under the same name or under different names, if the bidding entities are owned or controlled by the same person, or if the bid (1) is submitted late or to the wrong place, unless the department determines that the bid was received before the last date and time set for bid opening and that the delay or incorrect place of bid submission was due to an error of the department; (2) does not include the required bid deposit; (3) is not validly signed; (4) is illegible; (5) is not submitted in a sealed package; (6) fails to acknowledge all material addenda the department has issued; (7) offers an alternative compensation formula that the bid documents do not allow; (8) does not conform in all material respects to the bid documents; or (9) is conditional.
Authorities
02.15.020;02.15.060;02.15.070;02.15.090
Notes
Authority
AS 02.15.020 AS 02.15.060 AS 02.15.070 AS 02.15.090History
Eff. 3/28/2002, Register 161; am 3/22/2008, Register 185