Section 17.60.925. Sign permit duration and renewal.  


Latest version.
  • 	(a)  A tourist sign permit allows the holder named on the permit to arrange for a sign contractor to manufacture, install, and maintain the sign as specified on the permit and in this chapter until the permit expires. Except as provided in 17 AAC 60.930, a sign permit issued under this chapter expires on December 31 of the fourth year following the date the permit was issued.  
    	(b)  A tourist sign permit holder may renew the permit by following the application procedure specified in this chapter for the particular tourist sign. A renewed permit expires five years following the date the old permit expired.  
    	(c)  A tourist sign permit holder shall arrange, at the holder's expense, for a sign contractor to remove the sign before the permit expires unless, before the expiration date, the holder receives a renewed permit for the sign.  
    

Authorities

19.05.010;19.05.020;19.05.040;19.25.105;19.25.200

Notes


Authority
AS 19.05.010 AS 19.05.020 AS 19.05.040 AS 19.25.105 AS 19.25.200
History
Eff. 5/18/97, Register 142