Section 18.15.140. Public notice.  


Latest version.
  • 	(a)  Public notice of the certification application will be published jointly with notice of the proposed action by EPA under 40 C.F.R. 124.10. The notice will include the information required by 18 AAC 15.050(b).  
    	(b)  If the certification request involves a proposed modification to an NPDES permit for which EPA does not propose to issue public notice, the department will issue public notice in conformity with 18 AAC 15.050(b) within 10 days after receipt of the certification application. However, the department will not provide public notice for proposed modifications to an NPDES permit, if the department determines that the proposed modifications will not result in a significant change in the location, volume, type, or concentration of the discharge.  
    

Authorities

46.03.020;46.03.110

Notes


Reference

18 AAC 15.020
Authority
AS 46.03.020 AS 46.03.110
History
Eff. 11/25/77, Register 64; am 7/11/2002, Register 163