Alaska Administrative Code (Last Updated: January 12, 2017) |
Title 18. Environmental Conservation. |
Chapter 18.32. Milk, Milk Products, and Reindeer Slaughtering and Processing. |
Article 18.32.1. Milk and Milk Products. |
Section 18.32.030. General operating and permit requirements.
Latest version.
-
(a) A person described in 18 AAC 32.010(b) may not conduct an activity described in 18 AAC 32.010(a) or (b) unless (1) the person has a current permit issued by the department under this section; and (2) the department has confirmed compliance with this chapter by inspections conducted as provided in the PMO. (b) An applicant shall apply for a permit, using a form supplied by the department. If the application is for a facility in which an activity described in 18 AAC 32.010(b)(1) or (b)(3) occurs, the application must include a facility plan, including a plot plan, of the entire premises; the facility plan must meet the requirements of the PMO and must include (1) the location of buildings and property boundaries; (2) a plumbing schematic that shows hot and cold potable water lines and nonpotable water lines; (3) a floor plan with the specifications of the finish materials used for floors, walls, and ceilings; and (4) proof that the facility's (A) drinking water supply and treatment complies with 18 AAC 80; (B) wastewater disposal complies with 18 AAC 72; and (C) solid waste disposal complies with 18 AAC 60. (c) The department will, in its discretion, request additional information before issuing a permit. (d) If the department issues a permit under this section, it will assign a permit number to the facility or milk hauler. (e) A permit issued under this section does not expire. The permit (1) may not be transferred from one owner, operator, or facility to another; and (2) is subject to the suspension, revocation, and reinstatement provisions of section 3 of the PMO. (f) If the owner or operator of a facility required by this section to have a permit changes, or if the location of a facility required by this section to have a permit changes, the owner or operator of the facility shall submit a new permit application and obtain a permit.
Authorities
03.05.011;03.05.020;44.46.020