Section 18.52.040. Centralized inspection program.  


Latest version.
  • To carry out the requirements of this chapter, an implementing agency may implement a centralized I/M program that  
    		(1) meets the performance standards described in 18 AAC 52.035(d);  
    		(2) is conducted at a test-only inspection facility operated by the implementing agency or its contractor; and  
    		(3) otherwise meets the applicable requirements of this chapter.  
    

Authorities

46.03.020;46.14.030;46.14.510

Notes


Authority
AS 46.03.020(10) AS 46.14.030 AS 46.14.510
History
Eff. 2/1/94, Register 129