Alaska Administrative Code (Last Updated: January 12, 2017) |
Title 20. Miscellaneous Boards and Commissions. |
Chapter 20.25. Alaska Oil and Gas Conservation Commission. |
Article 20.25.1. Drilling. |
Section 20.25.005. Permit to drill. |
Section 20.25.010. Re-entry of a suspended well. |
Section 20.25.015. Changes to a program in a permit to drill. |
Section 20.25.020. Designation of operator. |
Section 20.25.022. Notice of ownership. |
Section 20.25.025. Bonding. |
Section 20.25.026. Claims. |
Section 20.25.030. Casing and cementing. |
Section 20.25.033. Primary well control for drilling: drilling fluid program and drilling fluid system. |
Section 20.25.035. Secondary well control for primary drilling and completion: blowout prevention equipment and diverter requirements. |
Section 20.25.036. Secondary well control for through-tubing drilling and completion: blowout prevention equipment requirements. |
Section 20.25.037. Well control requirements for other drilling and completion operations. |
Section 20.25.040. Well identification. |
Section 20.25.045. Sealing off strata(Repealed). |
Section 20.25.047. Reserve pits and tankage. |
Section 20.25.050. Wellbore surveys. |
Section 20.25.055. Drilling units and well spacing. |
Section 20.25.061. Well site surveys. |
Section 20.25.065. Hydrogen sulfide. |
Section 20.25.066. Gas detection. |
Section 20.25.070. Records and reports. |
Section 20.25.071. Geologic data and logs. |
Section 20.25.072. Temporary shutdown of drilling or completion operations. |
Section 20.25.075. Other wells in designated areas. |
Section 20.25.080. Annular disposal of drilling waste. |