Section 20.25.115. Shut-in wells.  


Latest version.
  • 	(a)  No later than March 31 of each year, an operator shall file with the commission a report on completed development or service wells that have been shut in for 365 days or longer as of January 1 of that year. The report must provide  
    		(1) the current known mechanical condition of the well, including the condition of installed tubing and casing strings;  
    		(2) the date the well was shut in and the circumstances surrounding the decision to shut in the well; and  
    		(3) an analysis of the future utility of the well.  
    	(b)  The commission will require an operator of a shut-in well to file additional information as the commission considers necessary to ensure that freshwater and hydrocarbon sources are protected.  
    

Authorities

31.05.030

Notes


Authority
AS 31.05.030
History
Eff. 11/7/99, Register 152