Section 3.107.230. Exclusions from power cost equalization.  


Latest version.
  • 	(a)  A customer whose facility has more than one meter will only receive power cost equalization credit for the master meter.  
    	(b)  Power consumption measured by a station service meter required in 3 AAC 107.200 is not eligible for power cost equalization credit.  
    

Authorities

42.45.100;42.45.110;42.45.160;42.45.170;44.83.080

Notes


Authority
AS 42.45.100 AS 42.45.110 AS 42.45.160 AS 42.45.170 AS 44.83.080
History
Eff. 2/16/96, Register 137