Section 3.48.466. Supporting information for simplified pipeline tariff rates.  


Latest version.
  • 	(a)  A pipeline carrier filing a simplified pipeline tariff to implement simplified pipeline tariff rates for the first time shall file with the tariff  
    		(1) an affidavit itemizing actual plant expenditures by major asset class and attesting that all plant costs were prudently incurred and expended solely for the purpose of providing the regulated service; and  
    		(2) an affidavit stating the basis for the actual or estimated throughput level and attesting that the actual or estimated throughput level complies with 3 AAC 48.464(e) and is based on the most accurate information available at the time of the filing.  
    	(b)  A pipeline carrier proposing to revise simplified pipeline tariff rates voluntarily or as required by 3 AAC 48.464(h) shall file with the tariff  
    		(1) an affidavit itemizing any additions to or retirements of plant by major asset class and attesting that all additional plant costs were prudently incurred and expended solely for the purpose of providing the regulated service; and  
    		(2) an affidavit stating the basis for the actual or estimated throughput level and attesting that the actual or estimated throughput level is based on the most accurate information available at the time of the filing.  
    

Authorities

42.06.140;42.06.350;42.06.360;42.06.370;42.06.380;42.06.390;42.06.410

Notes


Reference

3 AAC 48.464