Section 5.35.055. Permits for processing vessels.  


Latest version.
  • The owner or operator of a vessel used in the processing of Tanner crab shall obtain a permit from the department before starting processing operations. The permit must contain the following requirements:  
    		(1) reporting of vessel location to the department;  
    		(2) reporting of harvesting or processing operations to the department;  
    		(3) reporting of unloading and transport operations to the department;  
    		(4) permission for local representatives of the department to inspect at any time the vessel's holds, live tanks, freezers, processing areas, and processed and unprocessed Tanner crab; and  
    		(5) reporting of any other information required by the department for the conservation and development of Tanner crab resources.  
    

Authorities

16.05.251;16.05.685

Notes


Reference

5 AAC 39.645
Authority
AS 16.05.251 AS 16.05.685
History
Eff. 7/25/82, Register 83; am 6/30/83, Register 86