Section 18.60.211. Class III community MSWLF permit application.  


Latest version.
  • 	(a)  Except for a Class III MSWLF that meets the requirements of 18 AAC 60.200(c)(l), the owner or operator of a Class III MSWLF that meets the requirements of 18 AAC 60.300(c)(3)(B) must have a permit and must submit a complete permit application to the department as required under 18 AAC 15.020.  
    	(b)  An application for a new Class III MSWLF permit must be made on a form provided by the department. The form must be signed by the applicant or an authorized representative of the applicant and must include  
    		(1) contact information for the owner and operator of the landfill;  
    		(2) location information for the landfill property;  
    		(3) documentation that identifies the landowner; if the landowner is different than the landfill owner, that documentation must be accompanied by a  
    			(A) copy of a lease agreement that is clearly relevant to the proposed landfill; or  
    			(B) written statement signed by the landowner showing that the landowner consents to locating a landfill on the property and agrees to the placement of a notation on the property deed as required under 18 AAC 60.396(b);  
    		(4) a map of the landfill vicinity that includes the boundaries of the landfill property and depicts the location of and the distance to  
    			(A) the nearest community;  
    			(B) the nearest residential property;  
    			(C) the nearest drinking water source;  
    			(D) nearby surface water bodies; and  
    			(E) any airport or landing strip within 10,000 feet of the landfill;  
    		(5) a site plan for the proposed or existing landfill;  
    		(6) an operations plan for the proposed or existing landfill that includes guidelines for the daily operations of the landfill; and  
    		(7) an estimate of the costs for closing the landfill in accordance with the requirements of 18 AAC 60.390 and 18 AAC 60.396.  
    	(c)  An application for renewal of an existing permit for a Class III MSWLF must be made on a form provided by the department. The completed form must be submitted to the department not later than 30 days before the expiration date of the existing permit.  
    	(d)  The permit application for a new landfill or a renewal application that includes the lateral expansion of an existing landfill must include  
    		(1) drawings, documents, and plans showing that the design for the new or expanded landfill will meet the applicable requirements of this chapter; or  
    		(2) documentation that the design of the new or expanded landfill has been previously approved under 18 AAC 60.203.  
    	(e)  If an application is deficient, the department will notify the applicant and will describe the deficiencies. When the deficiencies are corrected, the application will be considered complete for purposes of 18 AAC 15.050, and the department will continue processing the application.  
    

Authorities

44.46.020;44.46.025;46.03.010;46.03.020;46.03.100;46.03.110

Notes