Section 8.80.090. Blowdown tanks.


Latest version.
  • Vented blowdown tanks must be designed for a minimum working pressure of 50 psi and be built in accordance with Section VIII of the ASME Code. If a blowdown tank is not vented, it must meet the requirements of the ASME Code, be manufactured to the maximum allowable working pressure of the boiler, and be equipped with a safety relief valve of capacity equal to that of the attached boiler.  
    

Authorities

18.60.180

Notes


Authority
AS 18.60.180
________________________
History
Eff. 6/21/84, Register 90; am 12/17/99, Register 152