Section 18.34.205. Permit requirements.  


Latest version.
  • 	(a)  Shellfish may be processed only in a land-based or dockside facility and only by a person who has a current annual permit issued by the department.  
    	(b)  Except for a shellfish harvester, a shellfish permit applicant shall meet the requirements of 18 AAC 34.035 - 18 AAC 34.060 and pay the permit fee required by 18 AAC 34.900.  
    	(c)  A shellfish harvester permit applicant shall submit to the department  
    		(1) the fee required at 18 AAC 34.900;  
    		(2) a completed form provided by the department;  
    		(3) an example of the actual shellfish tag to be used by the harvester as required by 21 C.F.R. 123.28, adopted by reference in 18 AAC 34.010;  
    		(4) a map and description of the location of the shellfish growing area;  
    		(5) a list of potential contaminants, including sewage, industrial waste, pesticide chemicals, and radionuclides, to which the shellfish might reasonably be expected to be exposed; and  
    		(6) the following information, if the harvest activity includes establishment of a shellfish harvesting residential campsite:  
    			(A) a copy of the lease agreement with the owner of the area that will be used as a campsite;  
    			(B) a description of the exact location of the campsite;  
    			(C) the length of time the campsite will be used.  
    

Authorities

17.20.005;17.20.065;17.20.072;17.20.180;44.46.020

Notes


Authority
AS 17.20.005 AS 17.20.065 AS 17.20.072 AS 17.20.180 AS 44.46.020
History
Eff. 12/18/97, Register 144; am 12/2/99, Register 152